Skip to the page's content
Back to Projects

100 Fetter Lane

Client

BREO Hundred Limited/Yard Nine

Location

London

Principal Contractor

Mace

ARCHITECT:

Fletcher Priest Architects

CLIENT:

BREO Hundred Limited/Yard Nine

MAIN CONTRACTOR:

Mace Limited

PROJECT DURATION:

51 weeks

SCOPE:

The design and build of the drylining, insulation and vapour control barrier to precast panels, mesh ceilings, riser doors, mist coat, and clay plaster to feature wall.

SPECIFICATION:

British Gypsum Drywall, Promat encasements, SAS system 330/220 Hybrid ceilings, The Access Panel Company riser door sets, Clayworks Plaster

Related projects

See more of our work like this